A turnover budget starts with the condition of the unit, not its label. One vacant apartment may need paint touch-ups and hardware repairs; another may need floors, cabinets and a bathroom rebuilt. Using the same per-unit figure for both makes it difficult to see what the approved spend will actually deliver.
Create one room-by-room scope per unit. Separate required repairs, optional upgrades and unknown conditions, then connect the accepted estimate to the handover list. Availability and completion dates must be confirmed for the specific work.
Distinguish a second turn from a full renovation
For an already renovated unit, a second turn may focus on local repairs, paint, hardware and fixture adjustments. Document what can remain before authorizing replacements. Matching materials, product availability and the condition of surrounding finishes can determine whether a small repair stays small.
A full turnover may combine flooring, painting, kitchen and bathroom work. Record the required finish standard so the estimate does not depend on an undefined idea of ‘rent ready.’ Room photos, dimensions and product references let the owner and contractor discuss the same work.
Build three columns for each unit
First list required work: the repairs and replacements needed for the agreed handover standard. Next list optional improvements that the owner can accept or defer. Finally list unresolved items that need inspection, a product selection or an additional quote.
A provisional item should remain visibly provisional. Do not bury an unknown bathroom condition inside a general painting allowance. When several units are involved, identify common product standards while preserving each unit’s differences.
| Category | Example | Decision needed |
|---|---|---|
| Required repair | Damaged door hardware | Approve repair or replacement scope |
| Optional upgrade | Replace serviceable cabinet handles | Owner accepts or defers |
| Unresolved condition | Stained surface with unconfirmed cause | Assess before agreeing restoration |
Review quantities and finish standards
Painting should identify rooms, surfaces, preparation and the expected finish. Flooring should identify the area, retained material, transitions and any preparation still to be assessed. A kitchen scope should distinguish cabinet repair from replacement and include the associated counter or fixture work.
Supply exact paint colours, sheen, flooring products and fixture models when you have portfolio standards. Define how substitutions will be approved. This prevents an estimate for an available product from being compared with a different, more specific standard later.
Treat the target move-in date as a dependency
Record move-out, inspection access, material availability and the requested handover separately. A preferred move-in date is an input to planning, not evidence that the renovation can be finished by then. Ask which decisions are needed before a schedule can be confirmed.
For occupied properties, coordinate access and any required notices through the appropriate property contact. For a vacant unit, confirm keys, loading, parking and building work hours. A missed access arrangement can disrupt an otherwise straightforward repair list.
Make the final comparison and handover traceable
Review the estimate, optional approvals and change records under the same address and unit number. Include the customer’s job or purchase order reference where required. Keep owner-supplied materials separate from contractor charges and clarify tax treatment before comparing totals.
Use the accepted work list again at handover. Mark completed items and record anything requiring follow-up. Send Avey the unit location, photos, condition list, finish standard and target dates to start a turnover estimate for Toronto, the GTA or Waterloo Region.
Your planning checklist
- Use one scope and reference per unit.
- Separate necessary, optional and unresolved work.
- Confirm product standards and substitutions.
- Review access and handover dependencies.
- Keep accepted scope, changes and invoice together.