INTERIOR RENOVATIONS & PROPERTY CAREToronto · GTA · Waterloo Region & beyond
KITCHENS · BATHROOMS · INTERIOR UPDATES

Condo Renovations in Toronto & the GTA

Update your condo kitchen, bathroom or interior with a scope that fits your unit and the building around it. Avey Construction helps homeowners and rental-property owners plan the work, coordinate access and review the estimate before scheduling.

Request a condo renovation estimate
Prefer to call?(226) 606-9636

Choose the work your unit needs.

Condo kitchen renovations

Plan cabinetry, counters, backsplash, appliances and finishing as one coordinated scope. A layout-preserving update starts with the existing connections and storage needs. Moving fixtures or changing walls brings additional design, building and approval questions to resolve first.

Explore the service and scope

Condo bathroom renovations

Choose a vanity update, shower work or a complete bathroom scope. Identify removal, surface preparation, waterproofing, fixtures, tile and final connections separately. Tell us whether the unit has another bathroom and whether management must arrange a water shutoff.

Explore the service and scope

Interior updates and rental turnovers

Combine approved flooring, painting, repairs and room updates around the condition of the unit. For a rental condo, distinguish work needed before occupancy from optional upgrades. Provide finish standards, access arrangements and the person authorized to approve changes.

Explore the service and scope

Give the building requirements a place in the estimate

Send the renovation package or written management requirements with your room photos. Ask about work hours, elevator reservations, loading access, protection, disposal and documents the building needs from contractors. Identify any fees or deposits and who is responsible for arranging them.

Product choices can also depend on the building. Before ordering flooring, ask management which acoustic or installation requirements apply. Before choosing large cabinets, counters or a tub, check the delivery route. These details belong in the scope discussion while options are still open.

Build a budget around the complete work

The same room dimensions can produce different scopes. Keeping cabinet and fixture positions may preserve parts of the existing layout; changing them requires a review of the connected work. Separate removal, preparation, products, installation, trade coordination and finishing so quotations can be compared fairly.

Keep owner-supplied purchases, allowances, taxes and separately arranged building costs visible. Ask what the proposed price assumes about existing conditions and how additional work would be reviewed and approved. Use our cost guides and quote worksheet to prepare questions before accepting a quotation.

Sequence the work around access and deliveries

A proposed start date needs more than a contractor opening. Confirm required approvals, product availability, booked access and decisions that must be made first. Countertop measurement, fabrication, installation and final connections may require separate visits.

If you will remain in the unit, discuss how you will use the kitchen and bathroom during each stage. Identify material storage and the route through the unit. Agree how schedule changes will be communicated and how outstanding work will be recorded at the final walkthrough.

Prepare for your condo estimate.

  • Property address and whether the condo is occupied
  • Room photos, approximate dimensions and the changes you want
  • Building renovation package and management contact
  • Work-hour, elevator, loading and shutoff requirements
  • Products already selected and items you will supply
  • Preferred timing and the person approving scope and changes

Compare two renovation quotes or build a budget worksheet with your own figures.

Confirm the approvals for your unit.

Start with the condo corporation’s governing documents and approval process. Building approval and municipal permits are separate checks. Review the proposed work with your management team and the municipality before proceeding, especially when walls, plumbing or shared systems may be affected.

Read the condo access and building-rules guide.

Kitchen and bathroom ideas from our work.

Explore Avey’s wider project gallery to discuss cabinetry, fixtures and finishes for your unit.

01Can I renovate a condo kitchen without changing the layout?

A layout-preserving update can focus on cabinetry, counters, backsplash and finishes. Confirm which appliances and connections stay, the condition of retained parts and the building’s requirements. Avey reviews the proposed scope before estimating the work.

02Does management approval replace a building permit?

No. The condo corporation’s process and municipal permit requirements are separate. Check both for the actual work and property before booking construction. The official resources above explain where to start.

03How long will a condo renovation take?

The schedule depends on the work, approvals, material availability, building access and installation sequence. Send the building requirements and preferred timing with your enquiry so the proposed schedule can account for these dependencies.

04Can Avey renovate a condo between tenants?

Avey handles rental-unit turnovers and second-turn repairs. Send the vacant or occupied status, approved scope, finish standards and access details. Confirm availability and the handover plan before committing to a move-in schedule.

PLANNING A RENOVATION?

Tell us about
your project.

Renovating a room or arranging repairs?
Tell us what you need and where.

Request an estimate
Prefer to call?(226) 606-9636