Update your condo kitchen, bathroom or interior with a scope that fits your unit and the building around it. Avey Construction helps homeowners and rental-property owners plan the work, coordinate access and review the estimate before scheduling.
Give the building requirements a place in the estimate
Send the renovation package or written management requirements with your room photos. Ask about work hours, elevator reservations, loading access, protection, disposal and documents the building needs from contractors. Identify any fees or deposits and who is responsible for arranging them.
Product choices can also depend on the building. Before ordering flooring, ask management which acoustic or installation requirements apply. Before choosing large cabinets, counters or a tub, check the delivery route. These details belong in the scope discussion while options are still open.
Build a budget around the complete work
The same room dimensions can produce different scopes. Keeping cabinet and fixture positions may preserve parts of the existing layout; changing them requires a review of the connected work. Separate removal, preparation, products, installation, trade coordination and finishing so quotations can be compared fairly.
Keep owner-supplied purchases, allowances, taxes and separately arranged building costs visible. Ask what the proposed price assumes about existing conditions and how additional work would be reviewed and approved. Use our cost guides and quote worksheet to prepare questions before accepting a quotation.
Sequence the work around access and deliveries
A proposed start date needs more than a contractor opening. Confirm required approvals, product availability, booked access and decisions that must be made first. Countertop measurement, fabrication, installation and final connections may require separate visits.
If you will remain in the unit, discuss how you will use the kitchen and bathroom during each stage. Identify material storage and the route through the unit. Agree how schedule changes will be communicated and how outstanding work will be recorded at the final walkthrough.